In line with the Nigerian Railway Modernization Project (Lagos-Ibadan section) with extension to Lagos Port at Apapa, the Lagos State Government will be shutting down Toyin Level Crossing around Okusanya street from tomorrow will subsequently be closed down on the January 21 to 22 2020 from 6:00pm to 12:00pm.
Alternative routes have been provided for road users to utilize during the course of the construction to ensure motorists reach their various destinations with ease.
Commuters driving along Okusanya Street are advised to make use of Jonathan Coker Street to get to their destinations.
The closure has been slated at this time, to ensure there is smooth and uninterrupted flow of work on the rail tracks.
Lagos State Government is hereby appealing to residents of the state, especially motorists that ply these corridors to bear the pains, as the project is aimed at achieving a seamless multi modal transport system that will meet the transportation need of a larger population.